Auric at Symphony Park
February
Auric at Symphony Park
February
The Project
The General Contractor on this project, Martin Harris Construction, was looking for a provider to fabricate several aluminum awnings and an aluminum sunshade for their multi-family project in Las Vegas. Based on the scope of work on the project, we determined that utilizing both our Helios and Atlas canopies would be the best solution.
The Solution
We designed, fabricated, and installed 48 Helios canopies, two Atlas canopies, and a tube frame sunshade with a vertical return, all with a dark bronze powder coating to maintain a consistent look across the entire building. We went above and beyond for our client and delivered a stunning solution.
The Products
- Helios Canopies (48)
- Atlas Canopies (2)
- Tube Frame Sunshade with a Vertical Return
- All with a Dark Bronze Powder Coat Berridge Finish
The Client
Martin Harris Construction was founded in Nevada and has since expanded to Arizona, California, Colorado, New Mexico, Texas, and Utah. With years of experience, Martin Harris provides first-hand trade knowledge and a dedication to providing excellence, with the assurance that any subcontractor selected will be held to their high standard.
Auric at Symphony Park
250 Promenade Place
Las Vegas, NV 89106
The Owner / Developer
Southern Land Company
3990 Hillsboro Pike
Suite 400
Nashville, TN 37215
Architectural Firm
GDA Architects
3090 Olive St.
Dallas, TX 75219
General Contractor
Martin Harris Construction
3030 S Highland Dr
Las Vegas, NV 89109